NEWS

Window Curtains Installed in the Offices of Jindi Tower: An Installation and Acceptance Record

Published: 2026-10-07

Floor-to-ceiling glazing brings an open view and ample daylight — and exposes window-side areas to direct sun on clear days. This roughly twenty-second video records the retrofit of an office area at Jindi Tower.

The footage begins with the installation: staff assemble the curtain track and film on the inner side of the glass, completing positioning, fixing and edge finishing in turn. Once installed, the curtain hangs close to the glass and the film takes up almost no indoor space; looking out from inside during the day, the outlines of the street and the building opposite are clearly recognisable.


Installation record at the offices of Jindi Tower

Project acceptance feedback shows the client is satisfied with the installation. Such feedback is common in project records: for office settings, what people usually care about is not a single parameter but whether concrete concerns — “will I still see outside clearly?”, “will it damage the existing fit-out?” — have been resolved. See-through performance and inner-side mounting are exactly the two premises that make the curtain acceptable in office buildings.

The written case for Jindi Tower has already been published on our website; this video adds moving footage of the installation.

The full video is available on the company website and official short-video accounts.


Zhongke Energy Consumption Control (Beijing) Technology Co., Ltd.
Website: www.zknkkj.com (project installation records and product videos on the homepage)
Tel: +86 186 1068 5811 (Mr. Guo) | WeChat: ESEC88888
Official short-video accounts (all enterprise-verified): Douyin “做节能的郭大侠” | Channels “Glass insulation防晒-郭大侠” | Xiaohongshu “郭大侠节能”