NEWS

News

Energy efficiency news · Curtain wall retrofit projects · Industry updates

Inside a street-front tea house at dusk, a light grey translucent shading screen is drawn two thirds of the way down in slim side rails on the room side of a glass curtain wall, with a teacup, keys and a folded white notice on the wooden table
2026-11-01

Three Months After the Screen Went Up, the Property Office Ordered It Removed: A Street-Front Tea House Stuck on Four Pieces of Paper

A 180-square-metre tea house on the ground floor of a 2018 building put a shading screen on the room side of its curtain wall. Not one hole was drilled. Three months after opening, a rectification notice demanded the original condition be restored. Behind that single sheet sit four documents: the lease, the fit-out agreement, curtain wall maintenance, and the pre-opening fire check.
Read more →
A large facade drawing spread on a review-room table with colour swatches, a fabric sample and a red marker
2026-10-26

Green Building Scores Now Come After the Compulsory Baseline: Shandong's Updated Assessment Standard Takes Effect on 1 November

Shandong's DB37/T 5097-2026 green building assessment standard takes effect on 1 November 2026. Three changes matter most for glazing: compulsory national codes become pass-or-fail control items, the roof/wall/window trio must meet hard limits with no trade-off route, and star ratings are only issued after completion — with an energy efficiency verification sheet. What it means for existing buildings.
Read more →
Infrared thermometer measuring the inner surface of a floor-to-ceiling window on a winter evening in a northern Chinese home
2026-10-24

How Cold Is the Glass Really? A Four-Step Winter Self-Check at the Window

Heating is on and the window seat is still unbearable — but "several degrees colder" is never a number. A practical four-step check: touch the glass, get an inner-surface temperature with the right tool and the right emissivity, compare it with the dew point from JGJ/T 151-2008, then decide whether to fix air, fix glass or fix the unit itself.
Read more →
从室内看到的玻璃幕墙更换施工现场,施工班组佩戴安全帽与安全带在脚手架旁集合,背景是大面积玻璃幕墙与室内Medium庭
2026-10-24

How Many Steps Does It Take to Replace One Curtain Wall Glass Panel? The Full Chain from Order to Acceptance

Replacing a single curtain wall glass panel looks simple on paper. In practice it runs through a long chain: matching the glass batch and coating colour, cutting out the old panel, hoisting, sealing, and a structural silicone curing period of one to two weeks before water testing. A walk through the five stages — and a note on when the glass is fine and only the thermal performance needs fixing.
Read more →
从室内看整排玻璃幕墙,半降的隔热透景Window Curtain覆盖在玻璃内侧,窗外是待更新的城市街道与沿街建筑,室内工位与绿植保持日常使用状态
2026-10-24

12 Million sqm of Housing, 18 Million sqm of Public Buildings: Shanghai's Three-Year Urban Renewal Plan Carries Two Energy-Retrofit Quotas

Shanghai's new urban renewal action plan for 2026-2028 is a city-upgrading document, not an energy policy — yet it commits to retrofitting 12 million square metres of existing housing and 18 million square metres of public buildings for energy performance. What the two quota lines mean, how they connect to the national carbon-peaking agenda, and which retrofit routes actually fit an update programme that insists on no large-scale demolition.
Read more →
1 2 3 … 13